Otevřít menu

Full flow central plant

  • Connection up to 60 machines
  • Filtration 15 – 30 μm
  • Separation 99% of tramp oil
  • Up to 8 times longer coolant lifetime

Full flow central plant with chips management

  • Connection up to 60 machines
  • Filtration 15 – 30 μm
  • Separation 99% of all tramp oil
  • With possibility of the transport of different materials of chips:
  • Steel
  • Stainless steel
  • Brass
  • Aluminium

Part flow central plant

  • Bypass filtration
  • Each machine is connected to the central tank
  • 20% better tool lifetime
  • Same quality of the cooling liquid in each machine

Machine connection to the central plant

  • With valves instead pumps in machines
  • With collecting vat
  • With a possibility of reduction of chips size
  • Filtration 15-30 μm
  • Separation of tramp oil